Project Type: Commercial/Retail
Area: Varies
Project Manager: Vedad Haghighi (33A and R-03)
Structural Engineer: Read Jones Christoffersen Ltd.
Mechanical Engineer: The Mitchell Partnership Inc.
Electrical Engineer: Hammerschlag & Joffe Inc.
Building Envelope Consultant: Rimkus (CRU 33A only)
Vertical Transportation Consultant: KJA Inc. (CRU 33A only)
All images, drawings, and text were created myself unless otherwise noted.
View towards R-03 on the mezzanine level (previously Illy’s) and food court above. Photo by others.
In Brief:
Both projects were back-to-base in scope, each with an additional construction feature and challenge: CRU 33A included a new BOH corridor and service elevator down to a new basement hallway and machine room (unexcavated) connected to a service corridor, and a new rooftop doghouse bringing services through an intermediary above tenant (Crate & Barrel). CRU R-03 involved an exhaustive study of routing lines for a new grease interceptor two levels down, running through existing high-end tenants on the ground floor (Coach, Peoples, and Browns), and new water, gas/vent, and refrigerant lines routed two stories up to the roof through a new exterior doghouse.
responsibilities
Project manager
Development of working drawings.
Coordination with consultants, client, and general contractor.
Contract Administration
As a project manager for both units, I was responsible for the establishment of working drawings (plans, details, schedules, OBC matrix and code compliance plans) and demolition/construction scopes of work), and all coordination and contract administration work.
Code and product research.
Bi-weekly site visits and on-site meetings.
working drawings
A selection of working drawings for CRU 33A.






working drawings
A selection of working drawings for CRU R-03